A thermal power plant had long relied on chemical antiscalant to control scaling in its reverse osmosis system. The operation faced high chemical consumption,high maintenance cost,frequent membrane cleaning,and pressure rise risks.

View Case Results
ScaleDp physical scale control device for RO water treatment system

Overview

The plant selected RO Train A as the test group and installed a ScaleDp scale inhibitor. RO Train B remained under the traditional chemical dosing method as the control group. The test group started operation on September 5,2024 and stopped antiscalant dosing for 7 months of monitoring.

Main Challenges

  • Regular manual chemical antiscalant dosing created high chemical cost.
  • RO membrane elements faced scaling and fouling risks.
  • Interstage differential pressure could rise quickly,leading to frequent chemical cleaning.

Project Goal

The project aimed to verify whether physical scale control could replace chemical antiscalant dosing while keeping stable RO pressure,stable water quality,and lower operating cost.

Implementation

Physical Device on RO Train A,Traditional Dosing on RO Train B

The comparison test used two RO systems under the same operating environment. Train A worked as the test group,while Train B continued the original chemical dosing method for direct performance comparison.

Core Modification

RO Train A installed the ScaleDp scale inhibitor and stopped chemical antiscalant dosing.

Control Method

RO Train B kept the traditional antiscalant dosing method and served as the control group.

Monitoring Period

The project monitored key operating data for 7 months from September 5,2024 to April 25,2025.

Acceptance Criteria

Clear Performance Targets

The project used pressure stability and chemical reduction as the main acceptance indicators.

≤0.02 MPa/monthTarget growth rate of second-stage interstage differential pressure
≥40%Target antiscalant saving rate
7 monthsContinuous monitoring period
0 kg/dayAntiscalant dosing in RO Train A after installation
Operating Data

RO Train A vs. RO Train B

During the test period,the two RO systems maintained consistent salt rejection and permeate conductivity. The main difference appeared in the scale control method and chemical consumption.

Operating ParameterRO Train A With ScaleDp scale inhibitorRO Train B With Traditional DosingRemarks
Second-stage interstage differential pressure60 kPa60 kPaPressure remained stable with no abnormal rise
Antiscalant consumption0 kg/day25 kg/dayThe antiscalant was a 5x concentrated solution
Water qualityStable salt rejection and permeate conductivityStable salt rejection and permeate conductivityThe physical device did not affect permeate quality
Scale control performanceEquivalent to traditional chemical dosingTraditional chemical scale controlThe test group met the pressure growth target

Train A: Physical Scale Control

After installing the ScaleDp scale inhibitor,RO Train A stopped antiscalant dosing completely. The system maintained stable differential pressure and stable permeate quality during the 7-month monitoring period.

Train B: Traditional Chemical Dosing

RO Train B continued the original chemical dosing method and consumed 25 kg of 5x concentrated antiscalant per day. Its pressure data remained comparable,but it still required daily chemical input.

Economic Value

100% Antiscalant Saving in the Test Group

The ScaleDp scale inhibitor achieved zero antiscalant dosing in RO Train A. This exceeded the acceptance target of 40% chemical saving and helped reduce long-term operating cost.

ItemBefore / Traditional OperationAfter ScaleDp scale inhibitor installationBenefit
Antiscalant use25 kg/day0 kg/day in the test group100% saving in RO Train A
Estimated annual chemical costAbout 90,000 RMB/yearGreatly reducedCalculated by 25 kg/day × 360 days × 10 RMB/kg
Payback periodOngoing chemical spendingInvestment recovered in about 1 yearThe plant later made a second purchase for wider application
Membrane cleaning cycleMore frequent cleaningCleaning cycle extended by about 50%Lower membrane loss and reduced maintenance workload

Results

The ScaleDp scale inhibitor delivered scale control performance comparable to traditional chemical dosing. The test group met the pressure growth target,achieved zero antiscalant dosing,and maintained stable permeate quality.

The project saved 100% of antiscalant in RO Train A,far exceeding the acceptance requirement. The device also helped extend the membrane cleaning cycle,reduce membrane wear,and lower the maintenance workload.

Zero antiscalant dosing in test group
Stable differential pressure
No negative impact on water quality
About 90,000 RMB annual chemical saving
About 1-year payback period
Cleaning cycle extended by about 50%

Key Benefits

  • Replaced chemical antiscalant with physical scale control in the test group
  • Reduced chemical consumption and operating cost
  • Maintained stable RO water quality
  • Controlled differential pressure growth
  • Extended RO membrane cleaning interval
  • Reduced membrane loss and maintenance workload
  • Supported wider plant-level application after successful operation